Installation

Source: Stone Innovations / CT1 Norge AS · Monteringsveiledning · Version 1.5 · 28.10.2026

Flexible sheets with real natural stone. For installation on suitable indoor and outdoor wall surfaces, including bathrooms where the wet-room construction is correctly executed.

01. Check and plan

Check the sheets before installation. Lay them out to plan colour variation, pattern direction, joints and corners. Natural stone has natural variations. Measure and trial-fit.

02. Prepare the substrate and backing

The substrate must be sound, stable, dry, clean, degreased and dust-free. Thorough dust removal is particularly important for outdoor installation on masonry, render or concrete. Primer may be used to bind dust and improve adhesion; check that it is suitable for the substrate and compatible with CT1 or PGB. Lightly sanding the back of the sheet and then cleaning with Multisolve is recommended to improve adhesion before installation. Remove sanding dust and allow the surface to dry completely. Check that the backing material tolerates the treatment.

03. Apply adhesive in vertical beads

CT1 sealant and adhesive is well suited to both bonding and joint sealing of natural-stone products. Apply CT1 in vertical beads on the back. In shower zones, approximately 5–10 cm spacing between adhesive beads is recommended for even support and reduced risk of voids. On other wall surfaces, the spacing can be greater, adapted to the sheet and substrate. Do not apply a closed adhesive frame around the sheet, as this can inhibit curing. Follow the adhesive manufacturer’s instructions.

04. Position and press evenly

Position the sheet accurately and press it firmly against the substrate. A clean paint roller can be used on the front with even, controlled pressure to improve contact with the adhesive. Avoid point loads that may damage the stone. Secure the sheet during curing if necessary.

05. Cutting and joints

Use tools suitable for the stone type and backing material, such as metal shears, a multi-tool, an angle grinder with a stone blade or a circular saw with a suitable blade. Use the necessary protective equipment and dust-reducing measures. Fine-adjust edges with sandpaper/a sanding block; light bevelling can produce neater joints. Remove dust.

06. Remove excess adhesive

Fresh adhesive in joints can be carefully removed with Multisolve and a suitable jointing tool/block if the surface tolerates it. Alternatively, allow the adhesive to cure before carefully cutting it away with a sharp utility knife, for example the following day if it has cured sufficiently. Test first on a small, inconspicuous area.

07. Joint sealing and protective treatment

CT1 sealant and adhesive is well suited to joint sealing of natural stone; check that the joint is appropriate for the construction and wet-room system. SurfaPore M is recommended near water and in wet environments such as bathrooms, showers, kitchens and exposed outdoor surfaces. In shower zones, two treatments are recommended according to the manufacturer’s instructions. SurfaPore C can be used on larger natural-stone surfaces indoors and outdoors. Test the treatment on a small area first.

Care and maintenance / FDV

Source: Stone Innovations / CT1 Norge AS · FDV · Version 4.0

01. Product information

Product: Large-format natural-stone panels. Supplier: Stone Innovations. Website: www.stoneinnovations.no. Material: Real natural stone. Weight: Approximately 5.5–6.5 kg per sheet. Natural variations: Variations in colour, shades, pattern and texture may occur from sheet to sheet. This is a natural characteristic of real natural stone and gives each panel a unique appearance.

02. Applications

Decorative cladding for indoor and outdoor walls, including bathrooms, shower zones, kitchens, foundation walls and façades. The panels do not replace a required membrane or other moisture protection. The substrate, fixing and construction must be suitable for the intended use and load.

03. Substrate and installation

The substrate must be stable, clean, dry and free from dust, grease and loose particles. Priming is recommended where needed to bind dust and improve adhesion. Before installation, checking and comparing the sheets is recommended so that natural colour and texture variations can be distributed for a harmonious result. To improve adhesion, lightly abrading the backs of the sheets with sandpaper is recommended, followed by cleaning and degreasing with Multisolve. Follow the product instructions. CT1 sealant and adhesive is recommended. Apply the adhesive in vertical beads to the back of the sheet, following the dedicated installation guide. This applies to both indoor and outdoor installation. Follow the adhesive supplier’s instructions on substrates, adhesive quantity, curing and any temporary support.

04. Protective treatment and surface protection

For easier cleaning and maintenance, protective treatment is recommended, particularly in bathrooms, shower zones, kitchens and on outdoor façades.

In bathrooms, shower zones and kitchens, SurfaPore M is recommended to reduce penetration of water and contaminants such as soap, oil and grease. SurfaPore C can be used on suitable substrates, for example larger outdoor façade areas, to reduce water absorption.

Protective treatment is a recommendation, not a general requirement. Always follow the supplier’s instructions and check suitability for the particular natural stone and application. Protective treatment does not replace a membrane.

05. Cleaning and maintenance

Clean with a soft cloth or sponge, lukewarm water and, if needed, a mild, pH-neutral cleaning agent suitable for natural stone. Avoid acidic products, strong chemicals and abrasive equipment. Remove spills promptly. Inspect surfaces, joints and fixing regularly, particularly outdoors.

06. Repair and replacement

Consider repair or replacement of damaged panels. Removal may damage the substrate. Follow the installation instructions when replacing panels.

07. Waste and documentation

Dispose of offcuts and discarded panels according to local waste schemes. Separate packaging for recycling. Product-specific technical instructions and relevant wet-room and façade requirements must always be followed.